The old Nest getting demoed.
Demo of the Post Office and Sports Grill.
Old book store / Spirit store demoed.
Demo of the Presidents Dinning Room.
Housing and Spiritual Life offices demoed.
Mabee room looking out into the courtyard.
Cutting the floor for new plumbing installation.
New addition for storing event equipment.
New footings being installed to support second floor.
Filling in the old courtyard.
Inside view of courtyard being filled.
Preparations for more filling.
Preparations for more filling.
Forms are being built for the pouring of the new loading dock for the Campus Center and Dining Hall.
Courtyard cement pouring finished.
This will be one of the new entrances that will pass by the new Sprit Store.
New plumbing for the kitchen in the Food Court.
Student Leadership Offices
New addition on the Northeast side that will be chair and table storage.
Campus Center Steel has started arriving. We should start seeing things go up soon.
Pouring concrete for the Northwest entrance.
Electrical units are starting to be added to the Mechanical Room
Loading Dock concrete pouring
Loading Dock concrete pouring
Steel began to rise today.
Steel began to rise today.
Steel began to rise today.
Mason contractors almost finished.
First floor almost complete.
Campus Center Bird's Eye View
Back loading dock on the west side of the building.
Beginning to hang some sheet rock on the upper parts of the walls.
Middle of the Campus Center
Tile on the wall of the restrooms.
Wellness Center Multipurpose Room
Post Office/Print Shop windows
Northwest Entrance into the Student Center
Ceiling of the middle section
Ceiling of the middle section with the stairway ready to be installed.
Contractors are installing the stairs to the second floor of the Student Center
Scaffolding in the dance hall going up.
Scaffolding in the dance hall going up.
Scaffolding floor installed. This will allow multiple people to do the required work on the inside ceiling.
Scaffolding floor installed. This will allow multiple people to do the required work on the inside ceiling.
President Dining Room on the second floor, above the main entrance.
Northwest Entrance by the Dining Hall
Post Office and Print Shop
Mabee Room, which was one room, will now be able to be divided into four separate rooms.
Central Gathering area facing west
Central Gathering area facing East
Mabee room kitchen with a new walk in cooler.
Fire Suppression pumps located in Mabee Dining Kitchen
Post Office cabinets getting installed.
This is the central gathering space. You will see the McM as you come in the front doors.
This is the elevator that was installed last week. They are closing-in the outside of it.
New sidewalks along the north side of the building and the northwest entrance.
New sidewalks along the north side of the building and the northwest entrance.
Counters, sinks and faucets are being installed in the bathrooms.
Staging area in Meeting room #1 and #2.
Student Affairs Suite Meeting room doors have been installed. Note they will be sliding doors instead of swinging doors.
Success Coaches office suite.
Four meeting rooms on the second floor.
Area for commuters to bring their lunch.
Food court tile installation.
Ceiling tile and lighting being installed in the Nest.
CAB offices getting ceiling tile, lights, and cabinets installed.
Sound Panels are being installed.
Flooring is starting to be installed in the hallway by the Fitness Center and restrooms.
Front Entrance is starting to take shape.
Gathering area, this picture is taken from the second floor looking down on to the central gathering area.
Food Court tile is currently being installed.
Second floor carpet has all been installed.
Front entrance: This is a 3000 lbs. granite logo.
Kitchen equipment is on site and getting installed.
President Board room carpet has been installed.
Student Success Center carpet has been installed.
Ceiling tiles have been installed along with lighting in the Nest.
The lighting and carpet has been installed in Carleton Chapel.
When the food court and Starbucks are closed these will be the panels that you will see.
Backyard sidewalk getting poured.
Backyard sidewalk getting poured.
Counters have been installed along with the kitchen equipment in the food court.
Starbucks counters have been installed.
We had a lot of furniture delivered last week, and it’s being stored in the Student Gathering area.
Booth seating on the second floor.
Reception area for Student Affairs and Spiritual Life.
This will be MSG’s office space.
Spirit Store entrance, you can see how the front doors will be able to open.
Fitness Center equipment getting installed.
Fitness Center equipment getting installed.
Fitness Center equipment getting installed.
Fitness Center equipment getting installed.
Food court grills and service area.
New lighting getting installed in the entrance.
Student Success and Student Affairs sliding office doors.
Student Success and Student Affairs sliding office doors.
Main gathering area seating installation.
Main gathering area seating installation.
The foundation and sidewalks have been poured on the west side of Mabee Dining for the outdoor trellis.
Graphics on the second floor wall outside the upstairs kitchen.
Mabee room lights have been installed. Ceiling tiles will be completed soon.
The package lockers for the Post Office have been installed and wrapped.
Another set of package lockers.
Graphics outside the Spirit Store.
The mill work is completed on the central gathering and it will be varnished next week.
IT is in the process of running miles and miles of data wires.
The Backyard trellis is on site and will be installed after the first of the year.
The trellis installation has started.
Installation of the blinds for the second floor.
Carpet in the central gathering area is complete.
Stage installation is complete. The new stage can be folded out as needed.
More office furniture is getting installed.
Reception area in front of the Student Affairs and RSL suites.
Fitness & Wellness Center
The Backyard Trellis is complete and furniture installed. It has seating for 52 along with tables. As you look at the picture the shade portion can be either open or closed. There is also lighting for night time events.
Installation of the turf on the Amphitheater levels.